Twenty years on the tools · then the software

I priced jobs badly for years.
So I built the thing that doesn't.

PriceM8 works out the materials, the labour, the waste and the VAT for landscaping and garden room jobs — then puts it on a quote the customer takes seriously. No spreadsheet. No "I'll ring you with a number."

Built in the UK · priced in £ · VAT where it belongs

Michal, founder of PriceM8, sitting on garden steps on site checking his phone, wearing a black hoodie with a toolbox beside him and a garden room he built in the background.
Plate 01 — Michal, pricing a job on siteEst. 2005 on site
  • MOT Type 1By the tonne, at your depth
  • Cuts & wasteA set allowance, not a guess
  • LabourDay rate that covers the van
  • VAT20% · shown, not buried
A — The sums you're doing in your head

Every job you underprice, you find out four days in.

These are the three that catch people out most. None of them are complicated. All of them are easy to get wrong standing in someone's back garden with a tape measure in one hand.

9.6 t

Not six tonnes

A 60 m² patio on 150 mm of compacted MOT Type 1 needs about 9.6 tonnes. Guess low and you've eaten the margin before the first slab goes down.

20%

Soil that won't fit back in the hole

Dig out a cubic metre and it doesn't compact back to a cubic metre — excavated soil bulks by around 20%. Guess the raw volume and you'll under-order the skip.

£41/hr

What an hour actually costs

Your day rate isn't your cost. Van, fuel, insurance, the hour loading up, the trip to the merchant you didn't plan on. It all lands somewhere.

PriceM8 does all three before you've got back in the van — and shows you the working, so you can argue with it.

Skilled rate, labourer rate, the split, and your own margins — set once in Settings, not guessed per job.

B — What it prices

Two trades. Both done properly.

Not a general-purpose quoting app with a landscaping label stuck on it. Two build types, taken off the way you'd take them off yourself — if you had a quiet hour and nobody ringing you.

840043.7 m² · 900×600 porcelain · 6 mm jointFall 1:80

Landscaping

Patios · drives · fencing · turf

Drop in the dimensions and the build-up. It takes off the sub-base by tonne at your compacted depth, the bedding, the slabs plus a waste allowance, the jointing, the edgings, the muck away — and the hours.

  • Paving — slabs, bond pattern, waste allowancem²
  • Sub-base at your compacted depthtonnes
  • Edgings, kerbs, haunchinglin m
  • Turf, topsoil, membranem²
  • Panel and featheredge fencing, decking, sleeper wallslin m
  • Muck away — skip or grabloads

Every line, not a sample — missing one is how a patio stops being profitable.

500015.0 m² · studs at 400 c/c · EPDM roof2500

Garden rooms

Offices · studios · gyms · annexes

A £28,000 build has three hundred things in it and any one of them can be the one you forgot. It generates the timber list at 400mm stud centres, the insulation and membranes, the cladding with a real waste allowance, the roof and the first fix.

  • Base — pads, screw piles or rafteach / m³
  • Frame at 400mm centrestimber list
  • Insulation, VCL, breather membranem²
  • Cladding — cedar, larch, composite or metal, front and sides set separatelym² + waste
  • EPDM or fibreglass roof, trims, outletm²
  • First fix, flooring, internal liningsm² / points

All of it, every time — that's the point of not doing this from memory.

C — Either side of the quote

The quote is the middle of the job, not all of it.

Before it, you're standing in a garden with a tape measure and a customer who wants a number. After it, you're chasing a deposit. PriceM8 covers both ends, so it isn't one more app to juggle.

On site

Before you price it

Most of the time lost on a quote is getting the measurements in. These take the tape measure out of it, or at least stop you copying figures from the back of an envelope.

  • Type the address or postcode and the client's details fill inlookup
  • Click round a lawn or patio on the satellite map for the area and the edgem² · lin m
  • Awkward shape? Note each side and which way you turn, and it works out the areasketch
  • Drive to site worked out from your yard, priced as miles and timemiles

Watch it measure a real job →

The paperwork

Quotes and clients

It should look like it came from a business that keeps its books straight, because it did. Your numbering, your logo, your client list.

  • Every client has a page: their quotes, their invoices, their address on a mapclients
  • Quotes numbered Q‑0045, and saved PDFs carry the number in the file namenumbers
  • Coming from other software? Start invoices and quotes from the number you were onyour series
  • Your logo and your terms on every document. PriceM8 isn't on thembranding

Watch a quote become an invoice →

Getting paid

After they say yes

The quote becomes the invoice in one click. Taking the deposit and the balance separately is a normal part of a job, so it handles that.

  • Quote to invoice in one click, nothing retypedinvoice
  • Record a deposit, then the balance. It shows what's paid and what's leftpart pay
  • Optional "Pay now": the customer pays from their banking app and the invoice marks itself paid. How that worksbank pay
  • A thank-you email once they've paid, with your Google review link if you add onereviews

Watch a deposit, then the balance by bank payment →

D — What the customer opens

A price they can read is a price they can say yes to.

Most quotes lose on the page, not on the number. A single line saying "Patio — £9,700" invites a haggle. A broken-down one invites a deposit.

PriceM8 — QuotationRef Q‑1042 · 14 Mar

Job

Rear garden patio — 60 m² porcelain, Cheshire

ItemAmount
Excavate and cart away60 m² × 250 mm · 4 grab loads£1,140.00
MOT Type 1 sub-base9.6 t · compacted to 150 mm£612.00
Sharp sand and cement bed40 mm · 2.4 t sand, 12 bags£288.00
Porcelain paving, 900×60060 m² + 8% cuts and waste£2,916.00
Jointing compound6 mm joints · 5 tubs£245.00
Labour2 operatives × 6 days£2,880.00
Subtotal£8,081.00
VAT at 20%£1,616.20
Total£9,697.20
Prices held 30 days · 25% on commencementExample quote — figures illustrative
  • Line by lineThe customer sees where the money goes, so the conversation is about the build, not the total.
  • Your logoIt goes out as your business, on your headed paper. PriceM8 isn't on it anywhere.
  • Same dayPrice it in the van, send the PDF before you've pulled off the drive. First quote in usually wins.
  • Your ratesMaterial prices start sensible and you overwrite any of them with what your merchant actually charges you.
E — Who built it

The software was the second job.

"If it doesn't survive a wet Tuesday in February, it doesn't go in."

I laid my first patio in 2005. For most of the twenty years after that I priced work the way nearly everyone does — a pad in the van, a spreadsheet that got copied and broken, and a gut feeling that had been right often enough to trust and wrong often enough to hurt.

The jobs that lost money were never the dramatic ones. They were the ones where the sub-base went in deeper than I'd allowed, or the cuts round a curve ate half a pallet, or I'd quoted five days and it took seven. Small, boring, repeated.

So I started writing the calculations down properly. Then I started checking them against jobs I'd already finished and knew the real cost of. Then it stopped being a spreadsheet and became this.

Every figure in PriceM8 came off a real job, not a supplier's brochure and not a language model's best guess. When the numbers are wrong, it's because a merchant changed a price — not because nobody who wrote it had ever held a whacker plate.

  • 2005–nowStill on the tools. Still building gardens and rooms in them.
  • CheckedEvery calculation tested against a job that actually happened, at its real finished cost.
  • UK onlyPounds, tonnes, metres, 20% VAT, UK merchant ranges. Nothing converted from somewhere else.
  • Still using itEvery quote on every real job I price goes through PriceM8 first — patios, fencing, garden rooms, real customers. If the number's wrong, I lose money before you do.
F — Next one

Price the next one properly.

Take a job you've already done and put it through. If the number doesn't land within a few percent of what it actually cost you, walk away — that's a fair test and it's the one I'd run.

Start free trial →14 days free · card needed to start · not charged till the trial ends